CUBA’S INFRASTRUCTURE:
PRESENT AND FUTURE
DR. MANUEL CEREIJO
INTRODUCTION
The prevailing view of Cuba’s economy, even before the break-up of the
Soviet Union, was that it was sickly and distorted. In the intervening
30 years Cuba received large subsidies from the former Soviet Union via
its sugar-for-oil agreements, and other monetary assistance, which kept
things going but did little to develop the infrastructure, industry,
and, therefore, the economy.
The government spent disproportionately large sums of money to establish
its influence in many Third World countries through both military and
foreign aid expenditures. Also, large sums were spent in the creation of
a large and highly qualified intelligence and repressive military
domestic force.
Large sums were also directed to activities, such as the development of
biotechnology and bioscience centers, not appropriate in magnitude and
expenses for a small nation. In fact, this sector, in spite of the fact
that it has state-of-the-art facilities, has continued to receive
investment despite cutbacks in every other sector of the economy.
Therefore, the government was unable to create a modern industrial
infrastructure.
Much of the industrial plant and equipment, as well as the basic
infrastructure, such as electrical energy, telecommunications,
transportation, water and sewer facilities, housing, etc., obtained or
assisted in the construction and/or maintenance by the Soviet Union or
East European countries, was greatly inferior to what was available in
the Western markets, and in particular was highly inefficient and highly
wasteful of fuel.
The level of the future investment-on a post Castro, democratic nation-
needed in industry and infrastructure, in general, will depend on
factors such as age and appropriateness of the installed technology and
the degree to which the installations have deteriorated as a result of
recent neglect.
However, basic, tangible infrastructure, which will be the topic of this
paper, will need to be overhauled at all levels.
ELECTRIC ENERGY
All the electric energy generation, transmission and distribution in
Cuba is controlled by the government, under the “Empresa Electrica
Cubana”, which is part of the Ministry of Basic Industies”. Presently,
the system has an installed generating capacity of 3,500 Mwatts.
However, due to several factors that will be explained later in this
section, the real generating capacity is only 1,200 Mwatts.
Approximately 95% of these plants use oil as fuel. The industry employs
29,000 persons, of which, 1,100 are engineers, and 4,000 are
technicians. In 1989, a year much used as reference for many industrial
and economic comparisons, the electrical energy demand in Cuba was 2,500
Mwatts, distributed as follows: 60% for the industrial sector; 8% for
the commercial sector; 4% for the agricultural sector; and 25% for
domestic usage.
The demand, in 2002, was down to 950 Mwatts, mainly due to the almost
standstill of the industrial sector, as well as a low in the
agricultural and domestic usage.
There are 46 units in operation, located in 20 different sites. Only 30%
of the units are classified as of high efficiency. According to the type
of fuel used, 94% use fuel #6, and 5% use fuel #2. The equipment comes
from the United States, Russia, Eslovaquia, Germany, France, Japan,
Italy. Transmission voltage is 110Kv and 220Kv. The country is
interconnected by a 220Kv network.
The transmission cables are ACSR 150mm. The transmission structures are
of concrete, for the 110Kv lines, and metal for the 220Kv. Distribution
lines are 4.16Kv, and 13.8Kv, 60Hz. Wires for distribution are of
150mms, 70mms, and 35 mms, ACSR. Almost all distribution is overhead,
except some pre 1959 underground in La Habana.
The average service time of the operating units is 25 years. Some of the
units have over 50 years in service. The newest units were installed in
Matanzas, Cienfuegos, and Felton. The former with Japanese and French
technology. The latter from the Eslovaquian Republic.
Cuba consumed 13 million tons of oil in 1989,of which, 40 million
barrels, some 7 million tons. were for the generation of electricity. In
2002, Cuba consumed, for all needs, not only to generate electricity,
6.3 million tons. Of these, 1.2 million are domestic oil, not suitable
to be used in the generation of electricity because of its high content
of sulphur, approximately 9%.
The system has deteriorated tremendously, due to several factors: lack
of proper maintenance; use of inappropriate fuel; aging; unsuitable
spare parts; lack of system equilibrium; effect of the blackouts. In
order for a nation to have an adequate economic development, it must
have enough capacity of generating electric energy. In a post Castro,
democratic Cuba, this figure can be estimated at 3,900 Mwatts for the
first 3 years. This capacity must double in 10 years. In fact, in 5
years of the reconstruction period, the objective must be to have 350
watts per person.
The present average cost of construction or reconstruction of power
plants is $900 per kwatt. The estimate is then an investment of $1,500
millions in the first five years in plants. To this figure, we must add
an additional investment of $650 millions in five years for the
construction and reconstruction of all transmission and distribution
systems.
During the first year, emergency units must be installed through the
country, since the industrial and construction activities will need
immediate energy supply. It is very difficult to assign a dollar amount
to the total investment of these units, since they will vary from small
to large units, using oil, propane and diesel fuel. The typical average
cost for portable units is from $250/Kwatt to $950/Kw.
TELECOMMUNICATIONS
Telecommunications is not only one of the most important areas of
infrastructure for the future of Cuba, but one where investment and
development will be most needed. In the last 30 years we have seen a
real revolution in the world in telecommunications technology, and one
where Cuba has not been part. Microwaves, fiber optics, satellites,
wireless phones, digital switching, computer networking, internet,
electronic mail, faxes, interactive TV, just to name a few, are some of
the most recent technological breakthroughs.
In 1959 Cuba had 15 telephone lines per 100 inhabitants. Presently, in
2002, there are many countries in the world with less than 15 lines per
100 inhabitants. In 2002, Cuba has 4.5 lines per 100 persons. However,
is not only a drastic reduction in quantity, but the existing lines and
systems are not suitable for the speed, bandwidth, and applications of
modern telecommunications. There are approximately 1,500 engineers
working in the telecommunications industry in Cuba.
Of the 500,000 telephone lines existing in Cuba, approximately 200,000
are in La Habana. The telephone switching equipment is a combination of
crossbar, step-by-step, and a small digital switch, some 1,200 lines
serving certain areas of La Habana. Local networks consist of copper and
lead feeder and distribution cables whose average age is approximately
30 years. Except in certain areas of La Habana, cables are pole mounted.
These cables require, but do not receive, high maintenance, due to age
and exposure to elements.
Long distance service is provided by a combination of crossbar switching
systems and cord boards. Direct distance dial within the island is made
possible by the crossbar toll tandem network. Interoffice facilities in
the local networks are served by copper based digital carrier system, of
Japanese and German technology conforming to CCITT standards. The toll
network is served by a combination of a microwave backbone and a coaxial
carrier system. Assignment and maintenance practices are similar to the
techniques employed in the United States in the early 70’s, which
require at least 4 times the labor force as current methods.
The microwave network has a capacity of 960 channels, and it links La
Habana with the old province capitals. The coaxial cable system has a
capacity of 1920 channels, a mixture of Soviet and German technology.
The cable runs by the “new” 8 vias Autopista, all the way to Cabaiguan,
and then follows the old Carretera Central to Santiago. There are two
satellite systems in servive : the IntelSat, an automatic Japanese
system with 24 channels, and the Intel-Sputnik, a Russian manual system
with 60 channels. There is also, since the 90’s, a small cellular
service system, for tourists and businessmen. The system is a mixed
venture of the Cuban government with a Mexican firm.
The current value of the equipment in Cuba is calculated at $230
millions. The estimated capital requirements for implementation of a
telecommunications system in a post Castro Cuba is $2.9 billion in five
years. The analysis assumes the achievement of 15 lines per 100 persons
at the end of five years. The typical breakdown of costs are: Central
Office Equipment,30%; Outside Plant Feeder, 30%; Outside Plant
Distribution, 10%; Central Office facilities,15%; Toll Network, 15%. Or,
approximately $1,700 millions in Central Offices, and $1,200 millions in
Outside Plant. At the same time, and during the transition period, a
cellular telephone system must be established to provide instant
domestic and international communications. The initial investment for
such a system is estimated at $450 millions.
TRANSPORTATION
The transportation infrastructure in Cuba is practically non-existent.
The two primary objectives in this area should be: to provide a national
transportation network of highways/railroads; to provide an effective
and balanced roadway/transit system in all major urban areas. For the
first five years, in a post- Castro Cuba, the following conclusions
apply:
1. No identifiable major deficiency is apparent in the interregional
highways network. Concentrated effort should be on the completion of the
“8 vias” Autopista from Ciego de Avila to the east of the island, at an
estimated cost of $900 millions. An aggressive maintenance program of
the network at an estimated cost of $125 millions/year, while fostering
the establishment of an interregional transit system.
2. The infrastructure necessary to provide an adequate urban mobility
has been stagnant for the last 25 years. Concentrated effort should be
on providing an adequate mass transit system at a total estimated
capital cost of $400 millions and an estimated operational cost of $300
millions/year. While providing as many traffic operational improvements
as soon as possible, to handle the expected increase of vehicles in the
urban areas.
3. Railroad network is in a very poor operational state, both bulk cargo
and passenger service. Concentration should be on fast-tracking an
upgrade of the railroad network, at a total estimated capital cost of
$1,650 millions, and an annual operating cost of $170 millions/year.
4. Upgrade feeder highways to the major economic centers of the island,
at a cost estimated at $1,300 millions.
The urban transit system is very important to facilitate mobility in the
major cities. Approximately 5,400 buses, 45 passengers, should be
acquired and be in operation within the first five years. Of these,
3,000 will be serving La Habana. Adequate urban, inter-cities, and
railroad transportation is essential to achieve an stable and sustained
economic development.
WATER AND SANITATION
Two important services in a post-Castro Cuba will be water and
sanitation industries. The water and sewer services infrastructure
should be dealt with the objectives of addressing the initial short-
term emergency relief program of basic assistance during the initial
transition government, and the long term relief program needed to
initiate Cuba’s economic revival.
Very little has been done concerning water and sewer systems since 1959,
taking into consideration that the population has doubled since then. No
maintenance has been given to plants, distribution, collection and
transmission systems, and patch-up work is done when absolutely
necessary.
United States manufactured treatment plants have been repaired using
parts from the former Eastern Block, making these maintenances a
headache. A “zone” distribution system is now in effect since no
continuous overall supply can be given. Zones get service at different
times as a result of the system deterioration. Since all components are
so updated and in disrepair, short range considerations are very
difficult.
The bulk of the water and sewer facilities in the urban areas of Cuba
have an average life of 70 years. The useful life of water distribution
and sewer lines is universally accepted at 50 years, and only when
reliable maintenance has been provided.
As a summary we have:
1. The aqueducts built or fully repaired after 1959: 15%
2. Others which only give a few hours of water per day: 65%
3. Aqueducts that just carry the water to collection tanks: 20%
The recommendations to improve this infrastructure can be divided into
two parts: water distribution systems; sewage treatment and disposal.
Water distribution represents an emergency and should be planned and
handled in two stages. One, the emergency task. The other, permanent
facilities. The emergency task shall be considered as the level of work
to provide the minimum essential volume of water consumption and still
maintain a degree of health protection. Water treatment is essential,
and permanent facilities should be initiated from the beginning.
This is an infrastructure that is very difficult to have an accurate
estimate of the capital needed to rebuild the entire system. However, it
can be estimated, as an approximation, to be $1,900 millions in the
first five years, including aqueducts, transmission and distribution
systems, water treatment plants, sewer lines.
OTHER AREAS
There are other important tangible areas of infrastructure, which the
time frame to present this paper does not permit to be included in this
analysis. Among them: public education; housing; airports; ports. |
|
|